Use casePublic sector RFPs

Summary and questions, page cited

Four weeks to answer a 142-page RFP. The facts that decide the bid are scattered and must be quoted exactly, so the first days go to reading.

The gist in minutes, each sentence with its pageEvery answer points back to its passageThe reader checks, then decides

The assistantThe gist of the RFP

Document management services for four hospitals, in two lots, for four years. Price weighs 40%, technical value 50%.

source · Specifications p. 6, p. 7, p. 112
Actions on this RFP
What the reader does with an answer

Two passages differ · the AI shows both pages

01

Where it stalls today

The short version

Miss the site visit on page 14 and the whole response can be thrown out. The trouble with this RFP is its length: scope on page 6, penalties on page 87, scoring on page 112. Sophie has to read all of it before she can decide anything.

Sophie asks the open document instead. The assistant answers from the RFP in the viewer, and every sentence cites its page. She checks each answer on the passage it points to, and the go or no-go decision stays hers.

Specifications MRH-2026-114.pdfViewer
The RFP and the assistant, side by side. Each answer carries its page.
Bid case MRH-2026-114Case management
Into the bid plan. The facts checked on their pages feed the plan and the go or no-go note.

These screens are simple on their own. Their order is the method: the gist first, then the clauses that decide, then every fact checked on its page before it goes into the note. Sophie starts on the Monday the RFP arrived.

02

The gist

The RFP arrived on Monday. Sophie wants the shape of it before reading page by page.

Step 1Assistant

Ask for a summary of the whole document

Sophie Lane, bid manager at Norvia Document Services, opens the specifications in the viewer from the bid case. The document opens on page 1. She asks the assistant for the gist: what is bought, how it is split, how long, how it is scored.

Specifications MRH-2026-114.pdfViewer
Each sentence of the summary carries the page it comes from.
The shape of the RFP is clear on day oneSophie knows what she is reading for before she reads it.
Step 2Viewer

Check a citation on its page

Sophie wants to check the weighting before she writes it in her note. She follows the citation to page 112 and reads section 14.2, the award criteria table. The sentence in the summary matches the page.

Specifications MRH-2026-114.pdfViewer
The reader checks the passage herself before using the fact.
Picture the day a figure in your go or no-go note turns out wrong: how long does it take to find the page it should have come from?
Every fact can be traced to its pageNothing goes into the note that Sophie has not seen in the document.
Step 3Assistant

List the key dates

Sophie asks for every date in the document. The assistant lists six, each with its page, including a site visit that is mandatory for lot 2. She adds them to the bid plan.

Site visit, lot 2: mandatoryQuestions close 12/02Submission 12/11, 12:00
Key datesAI console
Each date cites its page, so the plan can be checked line by line.
The mandatory visit is not missedIt sits in the plan on day one, with the page that makes it mandatory.
03

The clauses that decide

The gist is clear. Now Sophie and her technical lead need exact answers, quoted.

Step 4Assistant

Ask about penalties for downtime

Service levels weigh 20% and carry penalties. Sophie asks what happens if the platform is unavailable. The assistant quotes clause 11.4: the availability target, the amount per hour below it, and the exclusion for planned maintenance.

Specifications MRH-2026-114.pdfViewer
The answer cites the clause, and the clause is one click away.
The cost of a bad month is known before pricingSophie prices the risk on the exact clause.
Step 5AI check

The AI flags two dates that disagree

Sophie asks the assistant to check the document for inconsistencies. It finds one: the timetable on page 3 gives December 11 for submission, and section 3.6 on page 15 gives December 10. She adds the point to the written questions for the buyer.

InconsistenciesAI console
Both pages are cited. Sophie reads them, then decides what to ask.
A wrong deadline is caught in week oneThe buyer clarifies it before the questions close, and the team plans on the right date.
Step 6Assistant

The technical lead questions the security exhibit

Ahmed Benali, the technical lead, opens Exhibit 4, the security requirements. He asks where patient data must be hosted and who may access it. The answer quotes section 3.2 and section 5.1, with their pages.

Exhibit 4, security requirements.pdfViewer
The answer quotes the text, so Ahmed checks the exact words.
The technical answer starts from the buyer's wordsAhmed answers the requirement as written, page in hand.
More on thisOur technology
04

Facts the team can rely on

Sophie turns what she read into a compliance matrix and a go or no-go note. The choices are hers.

Step 7Assistant

Draw up the mandatory requirements

Sophie asks for every requirement written as must or shall in the specifications and Exhibit 4. The assistant returns 23, each with its page. She sets a status on each: 19 met, two with a partner, one open for Ahmed, one her team cannot meet as written.

Compliance matrixCase management
The list is proposed by the assistant. The statuses are set by Sophie.
The no-go risk is visible earlyOne requirement the team cannot meet is on the table in week one.
Step 8Viewer

Leave the checked facts on their pages

Sophie drops a note on each page she checked: the weighting on page 112, the penalties on page 87, the date question on page 15. The writers who join next week open the same pages and read her notes.

Notes on the specificationsViewer
A note on a page is visible to everyone who opens it afterwards.
The team starts from the same checked factsNew writers read the notes on the pages, nobody rereads the RFP from scratch.
Step 9History

Every question and answer stays on record

Each call to the assistant keeps its question, its answer, the model and the time. When the director asks where the penalty figure came from, Sophie opens the exchange and its page.

Bid case MRH-2026-114 · HistoryCase management
An answer given three weeks ago can be read again, with its source.
Every figure in the note has a trailThe question, the answer and the page stay together, ready to reread.
05

The possible results

An answer is checked on its page, flagged because two pages disagree, or marks a requirement the team cannot meet. Each sends the bid a different way.

Checked

The page says it

The answer cites its page, and the reader has read the passage.

What follows: the fact goes into the bid plan or the note.
To verify

Two passages disagree

A date on page 3, another on page 15. The AI shows both.

What follows: a written question to the buyer, before the questions close.
Cannot meet

A requirement the team cannot fulfill

Found in the list of musts, with its page and its exact wording.

What follows: the bid manager weighs it in the go or no-go note.
The limits we set

It decides nothing about the bid. It sets no status in the matrix. Across the nine steps on this page, every fact is checked by a person on its page before it is used.

The AI summarizes, finds dates, answers on clauses and flags what disagrees. It reads only what the user may read, and every exchange stays on record.

06

In numbers

Pulled from the Pinecrest County bid. A different RFP and other questions will give other counts.

Day 1when the mandatory site visit enters the bid plan, with its page.
23 mustslisted with their pages, each status set by the bid manager.
1 datefound to disagree with another, before the questions to the buyer close.

Where these numbers come from. They are counted on the scenario described on this page, with example data. They are not a customer result.

The rules behind the gains

Zero blind readingProductivityThe gist comes first. The reader knows what to look for.
Zero untraced figuresReliabilityEvery answer cites its page, and the exchange stays on record.
Decision supportA person decidesThe AI proposes. The statuses and the go or no-go stay with the team.
07

Who uses it

Bid managers, the experts they lean on, and IT all touch this one.

End users

Bid managers and analysts

The first week goes into reading, before any decision.

  • The gist first, each sentence with its page.
  • Every date listed with its page.
  • Exact answers on a clause, quoted.
  • Two passages that disagree, flagged.
Experts

Technical and legal leads

Asked about one exhibit, you still have to find the page yourself.

  • Ask the exhibit in plain words.
  • The answer quotes the text and its page.
  • Your notes sit on the pages for the team.
  • Every exchange can be read again later.
IT and architecture

CIOs and architects

Staff paste documents into tools you do not control.

  • The assistant works inside the viewer you run.
  • It reads only what the user may read.
  • Every exchange is logged with the model used.
  • Your infrastructure or the cloud, as you prefer.

Start small

With one long document type. Take the RFPs, contracts or reports your teams read in full every week, and ask them their first three questions.

The assistant works inside the viewer, over the bid cases and documents you keep today.

Ready to try

Ask one of your own documents

Bring a long document your team read recently, anonymized, and the questions they had. We will ask them in the viewer and check every answer on its page.

The screens on this page are drawn to show one step at a time, with example data.

Uxopian Software helps organizations put AI to work across the systems they already run, without giving up control of their data, their infrastructure or their critical processes.